2017-03-03 Technical buildings for the tunnels under Hallandsåsen Two 8.7 kilometre parallel railway tunnels have been built to increase the traffic capacity over Hallandsåsen. As a subcontractor to our partner Goodtech – just like the assignment for the Stockholm City Line (Citybanan) – Holtab delivered a large number of substations and technical buildings.→ References Infrastructure Technical Buildings
2017-03-03 Technical buildings from Holtab to citybanan in Stockholm A 6-km commuter train tunnel with two new stations has doubled rail capacity and facilitates transfers between commuter trains and the underground, as well as saving commuters many precious minutes.→ References Infrastructure Technical Buildings